Shepparton SPS05 Main Sewerage Pump Station Refurbishment
Construction included:
Maintain pump station operation during refurbishment
Strip out existing pumps, pipework, valves and support structures
Construct new concrete foundations
Supply and install 3x Sulzer 132kW dry well submersible sewerage pumps
Fabricate and install stainless steel inlet pipework
Modify existing 600mm dia. stainless steel discharge pipework to suit new pump arrangement
Install new non-return valves 600mm dia.
Fabricate and install pipe supports
Test & commission