Design and Installation of Bulk FlowMetres
Girdwood Contracting has undertaken the works to design, construct and install/replace DN80-DN500 metre assembly including pits and associated works for Goulburn Valley Water
The scope:
• Works site visit
• Supply of Issue for Review and Construction drawings set
• Pit construction and supply & installation of pit covers
• Installation of flowmeters
• Construction of the bypass pipe and necessary connections where required
• Electrical cabling and connections
• Supply of design drawings
• Traffic Management
• VicRoads/Council Approval, where required.
• Supply of equipment as necessary for the completion of the contract works
• Setting out the works